In order to streamline the economy of production, connect several successive operations, reduce the labour required and the number of operators and reduce the manufacturing space we supplied a 10-position carousel for customer Gumotex. The carousel was fitted with individual assembly stations, which execute:
- Automatic seizure of components with the subsequent placement of the parts onto carousel beds
- Placement of the supporting frame of the sun visor mirror sun onto the carousel bed
- Moulding 4pcs of Bumpon parts into the supporting frame
- Mounting the mirror - mirror itself into the frame
- Mounting the outer cover of the mirror
- Mounting pivots connecting the cover and the frame
- Mounting check springs for the outer cover
- Camera colour control according to interior type
- Placing on the conveyor belt
- The carousel is equipped with tanks, which the operator fills or, where appropriate, inserts with partial component with a 30-60 minute reserve
- End customer BMW: Carousel cycle of 14 s per piece